Most flooring problems, such as hollow sounds, visible joints, gaps or planks that move underfoot, can be traced back to the base underneath, not the flooring itself. This guide explains how a floor is prepared before vinyl is installed in a Singapore home, what each step involves and why it matters for a long-lasting finish.

1. Why Floor Preparation Matters
Vinyl flooring follows the shape of the surface below it. Bumps, dips, loose tiles and debris do not disappear once the floor is covered. Over time they can show up as uneven joints, clicking or hollow sounds, planks that lift, or areas that wear faster than the rest.
Good preparation takes a little more time on day one, but it protects the look of the floor and the warranty that comes with it.
2. Check the Existing Surface
The installer starts by inspecting the base, whether it is existing tiles, a cement screed or another floor.
What is checked
- Bonding: a tap test along the floor finds hollow or loose tiles.
- Flatness: a long straightedge or level shows high spots and dips.
- Cracks and damage: chipped tiles, cracks and broken edges are marked for repair.
- Dampness: damp patches, leaks and new screed are checked before anything is covered.
- Heights: door clearances and the level where the new floor meets other areas.
Our guide on what to look out for before installing new flooring explains these checks from a homeowner’s point of view.
3. Repair Loose, Hollow or Damaged Areas
Small problems are repaired before the new floor goes down. Loose or hollow tiles may be re-fixed or removed and filled. Cracks and chipped areas are patched so the surface is solid and continuous.
If large areas are hollow or the existing floor is breaking up, overlaying is no longer suitable and the old floor may need to be removed. This is covered in our guide on overlaying or removing your existing floor.
4. Deal With High Spots, Dips and Grout Lines
Every flooring system has a flatness tolerance set by the manufacturer, usually measured as a few millimetres over a two-metre straightedge. Areas outside that tolerance need correcting.

Common fixes
- High spots: ground down so they do not push the flooring up.
- Small dips: filled with a patching or levelling compound.
- Wide or deep grout lines: filled where needed so the planks are fully supported.
- Uneven areas over a larger space: corrected with screeding or self-levelling.
5. Screeding or Self-Levelling Where Needed
When the floor is too uneven for local repairs, a new level surface is created. A sand and cement screed is used for larger level differences or where the floor needs to be built up. A self-levelling compound flows out to form a smooth, flat surface and suits floors that need a thinner, smoother finish.
The right method depends on how uneven the floor is, the depth needed and the flooring system. New screeds also need time to dry before vinyl is installed, which should be planned into the renovation schedule.
6. Control Moisture
Vinyl itself is water-resistant, but moisture trapped underneath can still affect the base and the floor around it. Leaks should be fixed first, and new cement screeds must be allowed to dry properly. Where dampness is suspected, the cause should be found and resolved before going ahead.
7. Clean the Surface Thoroughly
Before installation, the floor is scraped, swept and vacuumed. Old adhesive, paint drips, plaster, nails and small debris are removed. Even a small stone or lump under a plank can create a raised point or a clicking sound later.

A clean base lets the planks sit flat, lock together properly and stay quiet underfoot.
8. Prepare Doors, Skirting and Edges
Door frames are usually undercut so the flooring can slide neatly underneath, and doors may need trimming to open freely over the new floor height. Existing skirting is either kept, removed or replaced depending on the finish you want.
Click vinyl also needs a small expansion gap around the edges of each room. This gap is hidden by skirting or trims, so it should be planned before installation starts.
9. Let the Flooring Acclimatise
Vinyl boxes are usually delivered a little before installation and stored flat in the rooms where they will be laid. This lets the planks adjust to the room’s temperature and humidity. Follow the manufacturer’s guidance on how long this should be.

10. Why Click Vinyl Suits Most Homes
Most vinyl flooring installed in Singapore homes is click vinyl. The planks lock together at the edges with a click system and rest directly on the base, without glue. This makes it well suited to overlaying existing tiles, quick to install room by room, and easier to repair, because individual planks can be replaced.
Because click vinyl floats, it still relies on good preparation: a flat, stable and clean base, and a proper expansion gap at the edges. Glue-down vinyl is mainly used in commercial spaces and needs a smoother, more heavily prepared base.
- Existing surface tap-tested and inspected.
- Loose, hollow and damaged areas repaired.
- Flatness checked against the manufacturer’s tolerance.
- High spots ground and dips or wide grout lines filled.
- Screeding or self-levelling done where needed and allowed to dry.
- Leaks fixed and moisture checked.
- Surface scraped, swept and vacuumed clean.
- Door frames, skirting and expansion gaps planned.
- Flooring stored flat in the room to acclimatise.